Source Installed Capacity Punjab's Share
BBMB MW %age MW
Permanent Allocation Permanent Allocation
**Bhakra 1480 54.50 683.84
Dehar 990 48.00 475.20
Pong 396 24.90 98.60
Total 2866   1257.64
National Hydro Power Corporation      
Bairasul 180 46.50 83.70
Salal 690 26.60 183.54
Tanakpur 94 17.93 16.85
Chamera-I 540 10.20 55.08
Chamera-II 300 10.00 30.00
Uri 480 13.75 66.00
Dhauliganga 280 10.00 28.00
Dulhasti 390 8.28 32.29
Total 2954   495.47
National Thermal Power Corporation      
Singrauli 2000 10.00 200.00
Rihand-I 1000 11.00 110.00
Rihand-II 1000 10.20 102.00
Anta(G) 419 11.69 48.98
Auraiya(G) 663 12.52 83.01
Dadri(G) 830 15.90 131.97
Unchahar-I 420 8.57 35.99
Unchahar-II 420 14.28 59.98
Unchahar-III 210 8.10 17.01
Total 6962   788.94
Nuclear Power Corporation of India Ltd.      
Narora Atomic Power Plant 440 11.59 51.00
Rajasthan Atomic Power Plant #3 220 22.73 50.01
Rajasthan Atomic Power Plant #4 220 22.73 50.01
Total 880   151.01
Nathpa Jakhri Power Corporation / Sutlej Jal Vidyut Nigam Ltd. 1500 10.13 151.95
Tehri Hydro Development Corporation Ltd. 1000 7.70 77.00
OTHER SOURCES      
Tala 1020 2.94 29.99
Farakha 1600 4.18 66.88
Kahalgaon-I 840 12.27 103.07
Total  3460   199.94
Grand Total 19622   3121.94
Notes:
1. **After deducting common pool energy and Rajasthan share (15.22%).

2.  Over and above the permanent share, the present weighted average of share from unallocated quota of CS stations is 12.67% (174 MW) is also available.