Gross INSTALLED CAPACITY of PSPCL  as on 28.06.2017
       
Name of Project No. of Units MW Gross Installed Capacity (MW)
GNDTP, Bathinda 2 110 220.00
2 120 240.00
Total 460.00
GGSSTP, Ropar 6 210 1260.00
GHTP, Lehra Mohabbat (Unit # 1 & 2) (Stage-I) 2 210 420.00
GHTP, Lehra Mohabbat (Unit # 3 & 4) (Stage-II) 2 250 500.00
  Total 920.00
TOTAL THERMAL     2640.00
Shanan 4 15 60.00
1 50 50.00
Total 110.00
UBDC Stage -I 3 15 45.00
UBDC Stage-II 3 15.45 46.35
  Total 91.35
**RSPP 4 150 600.00
Less 20% J&K and 4.6% HP share from RSD -147.60
Net RSD share of Punjab 452.40
ASHP 4 33.5 134.00
MHP-1&2 6 15 90.00
MHP-3&4 6 19.5 117.00
MHP-5 2 9 18.00
  Total 225.00
TOTAL HYDRO     1012.75
TOTAL(HYDRO+THERMAL) 3652.75
PEDA & NRSE Private Projects 1188.57
Micro Hydel     5.60
Rajpura TPP  2 700 1400.00
Talwandi Sabo TPP 3 660 1980.00
GVK TPP 2 270 540.00
Total Installed Capacity within the State 8766.92
 
Central Sector (FIRM Share only) 4034.42
Share from BBMB 1161.28
Total Gross Installed Capacity (from all sources) 13962.62